European programme towards the 1 MeV ITER NB injector

A. Masiello, G. Agarici, T. Bonicelli, M. Simon, V. Antoni, H. De Esch, A. De Lorenzi, M. Dremel, P. Franzen, R. Hemsworth, M. Liniers, D. Marcuzzi, D. Martin, R. Piovan, A. Simonin, P. Sonato, E. Surrey, L. Svensson, A. Tanga, V. ToigoC. Waldon, P. Zaccaria

Research output: Contribution to journalArticle

23 Citations (Scopus)

Abstract

The ITER neutral beam (NB) system presents several challenges and a robust program is necessary in order to achieve the requirements within the tight constraints due to the ITER construction plan. The establishment of full scale NB test facilities (NBTF) has therefore become a centre piece of the international NB development strategy. This paper describes the status of the design activities that have been undertaken in Europe to develop the components for the heating NB injectors along with the main plans and results of the R&D activities. A description of the programme towards the establishment of the test facilities and the planned activities is also reported. © 2009 Elsevier B.V. All rights reserved.
Original languageEnglish
Pages (from-to)1276 - 1280
Number of pages5
JournalFusion Engineering and Design
Volume84
Issue number7-11
DOIs
Publication statusPublished - Jun 2009
Externally publishedYes

    Fingerprint

All Science Journal Classification (ASJC) codes

  • Civil and Structural Engineering
  • Nuclear Energy and Engineering
  • Materials Science(all)
  • Mechanical Engineering

Cite this

Masiello, A., Agarici, G., Bonicelli, T., Simon, M., Antoni, V., De Esch, H., ... Zaccaria, P. (2009). European programme towards the 1 MeV ITER NB injector. Fusion Engineering and Design, 84(7-11), 1276 - 1280. https://doi.org/10.1016/j.fusengdes.2008.12.090