Installation and commissioning of the 100 MeV preinjector linac of the new elettra injector

G. D'Auria, P. Borsi, A. Carniel, P. Delgiusto, O. Ferrando, A. Franceschinis, M. Milloch, A. Milocco, F. Pribaz, N. Sodomaco, M. Stefanutti, L. Veljak, D. Wang, L. Picardi, C. Ronsivalle

Research output: Contribution to conferencePaper

Abstract

A new full energy injector has been installed and commissioned at ELETTRA, the Italian Synchrotron Light Source facility in Trieste. It consists of a 100 MeV pre-injector linac followed by a 2.5 GeV booster Synchrotron, that fills the Elettra Storage Ring with 2.0 GeV and 2.4 GeV electrons. Here a complete description of the preinjector linac and a first evaluation of its performance will be presented and discussed.
Original languageEnglish
Publication statusPublished - 2008
Externally publishedYes
Event11th European Particle Accelerator Conference, EPAC 2008 - , Italy
Duration: 1 Jan 2008 → …

Conference

Conference11th European Particle Accelerator Conference, EPAC 2008
CountryItaly
Period1/1/08 → …

    Fingerprint

All Science Journal Classification (ASJC) codes

  • Nuclear and High Energy Physics

Cite this

D'Auria, G., Borsi, P., Carniel, A., Delgiusto, P., Ferrando, O., Franceschinis, A., ... Ronsivalle, C. (2008). Installation and commissioning of the 100 MeV preinjector linac of the new elettra injector. Paper presented at 11th European Particle Accelerator Conference, EPAC 2008, Italy.