Abstract

The 1MV bushing of the ITER Neutral Beam (NB) injector is a HV feedthrough for all the electrical bus bars and the water cooling pipes of the ion source and of the accelerator. It acts also as a barrier between the SF6 insulated HV line and the ITER primary vacuum. Two different accelerators have been considered for the ITER NB injector, namely the Multi Aperture MUlti Grid (MAMuG) concept, which is now the reference design, and the SINGle Aperture - SINgle GAP concept (SINGAP) as an alternative design. In this work the bushing reference design has been revised and adapted to the SINGAP option. The new design has been optimised by means of detailed electrostatic analyses. Mechanical analyses have been also carried out to assess the design of the bushing under the new loads in SINGAP configuration. © IEEE.
Original languageEnglish
DOIs
Publication statusPublished - 2006
Externally publishedYes
Event21st IEEE/NPS Symposium on Fusion Engineering, SOFE'05 - , United States
Duration: 1 Jan 2006 → …

Conference

Conference21st IEEE/NPS Symposium on Fusion Engineering, SOFE'05
CountryUnited States
Period1/1/06 → …

    Fingerprint

All Science Journal Classification (ASJC) codes

  • Nuclear and High Energy Physics
  • Nuclear Energy and Engineering

Cite this

Masiello, A., Dalla Palma, M., & Zacearia, P. (2006). Revision and adaptation of the reference design HV bushing to SINGAP configuration. Paper presented at 21st IEEE/NPS Symposium on Fusion Engineering, SOFE'05, United States. https://doi.org/10.1109/FUSION.2005.252937